Repute
2 - onshore pile design program
The second version of Repute is currently under development. This new version of the program adds the ability to design a wide range of single piles (driven, bored, augered, etc) to existing British and forthcoming European standards (BS 8004 and EN 1997-1). Pile group capabilities are being extended to include torsion loading and multiple load cases.
Development of Repute 2 is being sponsored by Corus (major sponsor), Atkins (technical sponsor), and Stent Foundations (technical sponsor).
The following releases of the program have been made available:
- Beta 2 (Build 611), 11/01/2007, (release notes) - current download*
- Beta 1 (Build 607), 31/07/2006, (release notes)
- Alpha 3 (Build 600), 24/03/2006, (release notes)
- Alpha 2 (Build 511), 01/03/2006, (release notes)
- Alpha 1 (Build 506), 05/08/2005, (release notes)
Please contact Technical Support to obtain a password and registration information to unlock the current download. Please note that this is pre-release software and it will contain bugs and errors. Do NOT use Repute 2 for design purposes at this stage. Geocentrix accepts no responsibility for your use of this pre-release software.
*Important - if you have already installed a previous version of Repute 2 on your computer, you MUST uninstall it first, before installing this version.
To learn how to use the program, please follow the tutorials in the following documents:
Geocentrix welcomes your feedback on Repute 2 and suggestions for
improvement. Please send all comments (favourable or unfavourable!)
to repute@geocentrix.co.uk. Please format the subject line of your email as follows:
Repute 2 <version> - bug/suggestion: <brief description>
e.g.
Repute 2 Beta 1: bug - assertion error when program is shut down via File > Exit command
Repute 2 Beta 1: suggestion - use different pictures on toolbar for different Wizards
Thank you for your interest in Repute!
|